2009 Small Residential
2nd Runner Up
Maertz Residence
Project Statistics
Location: Wabeno, Wisc.
Type: Private Residence—Seasonal Home
Size: 1,897 sq. ft. (floor)
ICF Use: 4,263 sq. ft. (All exterior walls) plus EPS decking
Cost: $250,000
Project Timeline:
Total Construction: 240 days
ICF Installation time: 60 days
Construction Team
Owner/Architect: Time and Mary Maertz
General Contractor: RJM Construction
ICF Installer: Premier Construction Group
ICF Distributor: BuildBlock (direct)
ICF System: BuildBlock
Fast Facts
- ICF gables reach 38 ft. above grade
- Completed in three pours
- Remote location, steep sloping lot and 12 corners
- Walk-out basement doubles as retaining wall
|