Project Statistics
Location: Tallahassee, Fla.
Type: Private Residence
Size: 2,873 sq. ft.
ICF Use: 2,204 sq. ft.
Cost: $450,000

Project Timeline:
Total Construction: 275 (finished Dec. ‘08)
ICF Installation time: 25 days

Construction Team
Owner: P. Lightner & L. Rigby
Architect: Fore Construction and Design
General Contractor: LDS Construction Services
ICF Installer: Same as GC
ICF Distributor: Florida ICF Supply
ICF System: Nudura/ Blockouts by V-Buck

Fast Facts

  • Designed around the concept of the spiral
  • First ICF job in area with ICF foundation
  • Inspectors required exposed “Termite Strip”
  • Rained 20 consecutive days and nights during ICF install