2009 Light Commercial
Winner
River Oaks Center
Project Statistics
Location: Paso Robles, Calif.
Type: Office/Retail Space
Cost: $3.4 million
Size: 20,000 sq. ft. (floor)
ICF Use: 9,620 sq. ft. (exterior walls)
Project Timeline:
Total Construction: 365 days
ICF Start-to-Finish Time: 30 days
Construction Team
Owner: Estrella Associates
Architect: Leonard Grant Architecture
General Contractor: Carrol Building Company
ICF Installer: B.J. Harvey Construction
ICF Distributor: Estrella Associates
ICF System: PolySteel/Bracing by ReechCraft/Blockouts by V-Buck
Fast Facts
- Saves 35% on natural gas and 30% on electricity
- Reduce water usage by 50% (800,000 gallons annually)
- Pervious concrete reduce runoff rate 75%
- Pre-certified LEED-Gold (Core and Shell)
- A “Truth Wall” in the main lobby features a cross section of the ICF wall behind plexiglass
- Features “ecoSmarts Interpretive Room” to educate visitors on products used, including ICFs
|