2008 Light Commercial
1ST Runner Up
Taylorsville Crossing
Project Statistics
Location: Taylorsville, Utah
Type: Retail Business Complex
Size: 15,700 sq. ft. (floor)
ICF Use: 14,750 sq. ft. (exterior walls) plus 400 sq. ft interior
Height: ICF walls to 36’ feet high (intermediate floors)
Project Timeline
Spring 2006 to Summer 2006
Construction Team
Owner: Hawes Brubaker Neider Real Estate Development
Architect: Richardson Design Partnership
General Contractor: Desert Sage Contractors/Kirk Holgate
ICF Installer: Utah ICF and Harrell Construction
ICF Distributor: Utah ICF/ Dan McCullough
ICF System: Logix / Bracing by Reechcraft / Block-outs by V-Buck
Fast Facts
- First ICF project for GC
- Prime location, visible from freeway
- ICF installer brought on board when project was 2 weeks behind schedule.
- Contacted on Thursday, asked to begin stacking next Tuesday
- Distributor had to train GC’s installation crew
- Glass on Main Floor means 2nd floor stands on columns
- Unusual Angles (10 and 80 degree)
- Tight Rebar.
- Inspector insisted no more than 4 vertical feet poured daily
|