2008 HEAVY CommErcial
Runner Up
CineMagic Atlantis
Project Statistics
Location: Burnsville, Minn.
Type: 15-screen Movie Theater
Size: 60,290 sq. ft. (floor)
ICF Use: 83,000 sq. ft. (walls), All exterior walls plus all demising walls between theaters
Height: ICF walls to 54 feet high
Project Timeline
Total Construction: 395 days
ICF Start-to-Finish Time: 8 weeks
Construction Team
Owner: CineMagic Theaters
Architect: TK Architects/ Theodore Knapp
General Contractor: Engelsma Construction/Greg Engelsma
ICF Installer: Gresser Company/ Mike Gresser
ICF Distributor: Cemstone Contractor Supply
ICF System: 13” iForm from Reward Wall
Fast Facts
- ICFs chosen for sound attenuation, fire rating,
and fast installation.
- Largest ICF project in Minnesota
- Significant savings on structural steel
- Significant savings on labor (1 layer of drywall per side instead of three)
- Owner can compare maintenance and energy costs with identical nearby theater made with precast panels.
- Featured in local business news publication and used by ICF distributor in presentations to local architects.
|